BTC pipeline transports over 16.2 million tons of oil in January–August 2026

In January–August 2026, the volume of oil transported through Azerbaijan’s main oil pipelines decreased by 8.7%, totaling 16,746,000 tons.

According to the State Statistics Committee, 76.6% of the total transportation was carried out via the Baku–Tbilisi–Ceyhan (BTC) main export oil pipeline.

During the reporting period, 81.9% (13,717,400 tons) of the oil transported through the BTC pipeline accounted for oil produced in Azerbaijan, while 18.1% (3,028,500 tons) consisted of oil supplied from Turkmenistan and Kazakhstan.